Capacity Intelligence
Simulated DataML-powered traffic forecasting for the Las Vegas Metro Market. Identify capacity risks before they impact customers.
Projected to exceed capacity in 6 months
3 small cells + 2 carrier adds
Traffic Growth Forecast
Average PRB Utilization (%) by cluster — 12-month projection
Sites Approaching Capacity Exhaustion
Sites projected to exceed 80% PRB utilization threshold
| Site | Cluster | Current PRB | 6-Month Proj. | Time to Threshold | Risk | Action |
|---|---|---|---|---|---|---|
| NV-0142 | Stadium | 45%(95% events) | 52%(97% events) | Already exceeding | CRITICAL | Deploy small cells |
| NV-0012 | Strip South | 58% | 72% | 8 months | HIGH | Carrier add |
| NV-0005 | Strip North | 55% | 69% | 9 months | HIGH | Carrier add + interference fix |
| NV-0011 | Strip South | 56% | 68% | 10 months | MEDIUM | Monitor |
Coverage Gap Analysis
Identified coverage gaps across Las Vegas Metro Market
| Location | Cause | Priority | Solution | Est. Cost |
|---|---|---|---|---|
| Allegiant Stadium | Event overload | HIGH | 3 small cells | $450K |
| Henderson Town Center | Hardware fault | HIGH | Repair antenna | $5K |
| I-15 Russell-St Rose | Missing neighbor | MEDIUM | Config change | $0 |
| Aria-Bellagio | Pilot pollution | MEDIUM | Tilt optimization | $0 |
New Site Recommendations
Proposed infrastructure additions based on capacity forecasting
Stadium Small Cells
Deploy 3 small cells around Allegiant Stadium to eliminate event-day congestion. Current macro site NV-0142 reaches 95%+ PRB utilization during events with 65,000+ attendees.
$450K
Eliminates event congestion, improves fan experience for 65K+ attendees per event
Strip South Densification
Deploy 2 small cells in the Aria-Cosmopolitan corridor to handle growing pedestrian traffic and resolve persistent pilot pollution between NV-0005 and NV-0012.
$300K
Reduces PRB utilization by ~15%, resolves pilot pollution on Strip South